| Project Chronology | About Iceberg Project | Contact Information | |
![]() |
Rebar (Deformed) Two-hundred and twenty #5 rebar were inserted between two 12” steel tubes at 2 1/2” intervals in a weave pattern. The tubes were hydraulically pinched together at one end forcing the rebar weave to bend upwards and eventually creating an inhabitable space beneath.
|
|
![]() |